Components for 70 new passenger wagons
Components, equipment and materials for the project to build 70 new passenger wagons for the railways of Uzbekistan in 2025–2026.

About the delivery
- Buyer
- Tashkent Passenger Wagon Building and Repair Plant JSC
- Scope of supply
- 6 supply lines for 70 new passenger wagons
- Period
- 2025–2026
About the project
Under the project to build 70 new passenger wagons in 2025–2026 at Tashkent Passenger Wagon Building and Repair Plant JSC, Mikas Miracle Group supplied a wide range of components, specialised equipment and production materials needed to build, equip and fit out passenger rolling stock.
The supplied products covered the key functional systems and structural elements of passenger wagons.
According to a report by Spot of 2 May 2026 citing the press service of Uzbekistan’s railways, the 2025–2026 modernisation programme for the wagon-building plants provides for 70 new passenger wagons; by that date 55 of them had been put into service, 10 of these in March and April, and work on the remaining 15 was expected to be finished by the end of June.
Supply lines
Running gear and bogie equipment
- Solid-rolled wheelsets and axles
- Gearbox axle and axle gearboxes
- Axlebox housings and retaining covers
- Hydraulic dampers
- Springs and spring sets
- Thrust plates and other running-gear elements
Brake and pneumatic equipment
- Brake cylinders
- Passenger-type air distributors
- Electro-pneumatic air distributors
- Brake rigging regulators
- Isolating and end cocks
- Release valves and stop cocks
- Connecting hoses and other brake-system elements
Electrical equipment and safety systems
- Alkaline storage batteries
- Generator equipment
- Sensors and connectors of the axlebox temperature monitoring system (SKNB)
- Fire alarm units with smoke and heat detectors
- Plug connections and electrical components
Mechanical equipment components
- SA-3 automatic couplers
- Cardan shafts
- Flexible couplings
- Mechanical equipment sets
Materials for interior finishing and passenger comfort
- Mineral-wool heat and sound insulation materials
- PVC floor coverings
- Sanitary equipment sets (bio-toilets)
Materials for production and protective treatment
- Welding wire of various diameters
- Polyurethane paints and varnishes
- Protective primers
- Finishing paint coatings
Result
The deliveries by Mikas Miracle Group covered a wide range of components and materials for the running gear, brake systems, electrical equipment, safety systems, interior finishing and fitting-out of passenger wagons.
Taking part in the project was a significant contribution by the company to domestic wagon building, to the production capacity of the railway industry’s plants and to the renewal of the passenger rolling stock of the Republic of Uzbekistan.
Gallery

A compartment of a new passenger wagon · Photo: Uzbekistan Railways JSC 
The corridor of a new passenger wagon · Photo: Uzbekistan Railways JSC 
Berths in a compartment of a new wagon · Photo: Uzbekistan Railways JSC

A four-berth compartment with the berths made up 
The coach corridor along the compartments 
At the head of a berth: reading lamp, USB sockets and climate control 
The attendant’s service area with an electric water boiler 
The washroom with an eco toilet
Illustrations by Mikas Miracle Group, not photographs of the delivery.
Sources
- Zamonaviy yo‘lovchi vagonlari: qulaylik, texnologiya va taraqqiyot uygʻunligi«O‘zbekiston temir yo‘llari» AJ (railway.uz), 30 April 2026
The photographs of the wagon and its compartments on this page; the programme for 70 new passenger wagons, 55 of them already in service.
- Article on the programme for new passenger wagonsSpot (spot.uz), 2 May 2026
The 2025–2026 programme: 70 new passenger wagons, 55 of them in service by the date of publication (10 in March and April), the remaining 15 expected by the end of June.